Jump to content

Search the Community

Showing results for tags 'twindexx'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Platform 1 - Birth & Death of a Forum
    • Welcome!
    • Forum Announcements
    • The Agora: General Administrative Discussions
  • Platform 2 - Model Railroading
    • Japanese: N Gauge
    • Japanese: Other Gauges & Scales
    • Trams, LRV's & Buses
    • Worldwide Models
  • Platform 3 - Products & Retailers
    • New Releases & Product Announcements
    • Suppliers
  • Platform 4 - (The Dark Side of) Modelling
    • The Train Doctor
    • DCC, Electrical & Automation
    • The Tool Shed
  • Platform 5 - Layouts, Clubs & Projects
    • Personal Projects
    • Club and Show News
    • T-Trak and Other Small Modular Formats
    • Scenery Techniques & Inspirational Layouts
    • Archived Project Parties
  • Platform 6 - Prototypes
    • Japan Rail: News & General Discussion
    • Japan Rail: Pictures & Videos
    • Worldwide Rail
  • Platform 7 - Other Destinations & Hobbies
    • Travel: Tips, Planning & Memories
    • Other Hobbies: Games, Simulations, Models & Photography
    • Off Topic

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Found 2 results

  1. Deutsche Bahn refuses to purchase the remaining 25 IC2 TWINDEXX sets (5 cars + one loco) from bombardier due to continued problems with the software (aka features). The features include: - The loco and the 5 cars are a set and cannot be uncoupled. One car stops working? That’s it, whole train stops working. You can’t switch out the car and the whole set needs to be repaired. - When reversing, computers crash and take about 30 minutes to reset, if that even succeeds. - The second iteration sets feature a dark mode. Meaning that randomly the lights refuse to turn on. - The first iteration made people motionsick due to uncontrolled swaying. Furthermore the sets are not equipped with the modern ETCS system, even though they should have been. The 25 sets are valued at approximately 400M euros, and are currently in the final stages of production. These trains aren’t the only high profile trains DB has in its possession which are plagued with issues; the ICE4 sets are also plagued with software issues and faster than normal wear and crack formation in the carriage frames, which also prompted DB to hold all future orders of new ICE4 sets (also produced by bombardier). source: https://www.sueddeutsche.de/wirtschaft/deutsche-bahn-ic-1.4773380
  2. http://www.globalrailnews.com/2015/06/09/first-glimpse-of-sbbs-new-double-deck-emu/ testing at Velim, Czech Republic: https://youtube.com/watch?v=p1ETr3ZbUwY https://www.youtube.com/watch?v=Lxdub3qIdKA *I suppose these will replace some of the currently loco-hauled IR services. Another reason to visit the Gotthard Route sooner rather than later.
×
×
  • Create New...