Jump to content

Long rail transport from Kita-Kyushu to Hokkaido for Shinkansen line construction


Recommended Posts

bikkuri bahn

150 meter long rails arrived in Oshamambe, Hokkaido today after a 2100km journey by rail.  These will be used in the Hokkaido Shinkansen construction from Shin Hakodate Hokuto to Sapporo.  Formerly rails arrived in 25m sections shipped by sea, and transfered to flatbed truck.

 

STV news report:

 

The train passing through Totsuka, Kanagawa Prefecture on the Tokaido Line:

 

  • Like 4
Link to comment

Again always amazes me 28 pieces of rail will bend so well on the transports! Even though my brain knows the physics part of my brain says thats just not right!

 

jeff

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...