Jump to content

Hiroden Electric Railway Hiroshima Ekimae Ohashi New Tram Terminus


Recommended Posts

bill937ca

Progress continues on the new Hiroshima Electric Railway terminus at Hiroshima Station.

 

 

The three track upper floor stub tram terminal is shown in this video.

 

 

  • Like 5
Link to comment
bill937ca
Posted (edited)

A walk around in the shopping concourse. Not really railway or tram related.

 

Posted today. [Ready!] Five days before the grand opening, the final checks are being carried out on the Hiroshima Station building "Minamore."

 

It's finally five days until the grand opening! We're bringing you the state of Hiroshima Station Building "Minamoa," which is no longer under construction and is now ready to open! The celebratory mood is finally building, and the media is starting to look like they're engaged in an information war. Everyone, all that's left is to go. But before that, why not take a look at the atmosphere! In this video.

 

 

 

Edited by bill937ca
  • Like 2
Link to comment
katoftw

I was there last September.  There's also a whole new route being build in the center of the network. 

  • Like 1
Link to comment
katoftw

Walked past that Junction about 20 times last September.  This thread has finally filled some gaps of info. Thanks 

Link to comment

The Minamoa Building at Shin-Hiroshima Station opened on March 24, 2025. The Hiroshima Electric Railway is scheduled to begin service at Shin-Hiroshima Station in July. Test runs are reported to be scheduled for June.

 

 

  • Like 1
Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...