lighthouse Posted January 29, 2018 Share Posted January 29, 2018 I tested the layout of the buildings, the future length of the platforms and the location of the tunnel portal. I may have to move the switch positions from the station to the other segment otherwise no 4-car train will fit into it. With low speeds, it looks very good :-) I will post a video in the next few days 1 1 Link to comment
Pauljag900 Posted January 29, 2018 Share Posted January 29, 2018 (edited) Took the tram module back outside yesterday and today fitted the viaduct tracks over it,had to raise the station area by 2” to get clearance need some more polystyrene boards then I ll be able to work out how many track piers I ll need. On the four upper level tracks part of the back and RH side will be rock face/ grass banks/brick wall with normal track which will free up some of the piers. Edited January 29, 2018 by Pauljag900 8 Link to comment
cteno4 Posted January 30, 2018 Share Posted January 30, 2018 Paul, Looking good! Jeff Link to comment
serotta1972 Posted January 30, 2018 Share Posted January 30, 2018 12 hours ago, Pauljag900 said: Took the tram module back outside yesterday and today fitted the viaduct tracks over it,had to raise the station area by 2” to get clearance need some more polystyrene boards then I ll be able to work out how many track piers I ll need. On the four upper level tracks part of the back and RH side will be rock face/ grass banks/brick wall with normal track which will free up some of the piers. I think Paul has been here many times before except now he has a quintessential American locomotive - the EMD F7A Santa Fe in the Warbonnet scheme running around. :) 2 1 Link to comment
Pauljag900 Posted January 30, 2018 Share Posted January 30, 2018 1 hour ago, serotta1972 said: I think Paul has been here many times before except now he has a quintessential American locomotive - the EMD F7A Santa Fe in the Warbonnet scheme running around. :) How on earth did that get there?😂 you know who s to blame👍👍😂😂😂 Link to comment
Tuga Posted January 30, 2018 Share Posted January 30, 2018 Woo!!! That's amazing. How many layers are you going to do? Link to comment
Pauljag900 Posted January 30, 2018 Share Posted January 30, 2018 28 minutes ago, tavora said: Woo!!! That's amazing. How many layers are you going to do? Hi Tavora, thanks. the lower level track will be 2 layers high(2”)and will go all around the loops the center level will be 4 layers(4”) on Station only the higher level will be 7 layers(7”) high on station only the two top levels will be a mix of support piers and mountain/hills/ walls etc. paul 1 Link to comment
Tuga Posted January 30, 2018 Share Posted January 30, 2018 7" high - That's really high mate. I bet it will be really nice when finished. Link to comment
Pauljag900 Posted January 30, 2018 Share Posted January 30, 2018 Cheers mate,I hope so.I m hoping to finish the polystyrene work in the next few days ,hopefully get some Trains running👍👍😀 Link to comment
IST Posted February 2, 2018 Share Posted February 2, 2018 Not a huge step, but at least something: I added some figures to the store. After it I realized that it was totally unnecessary to put figures inside the building, it can't be noticed. Added some figures to the T-trak corner modul, but completely forgot to take pictures about it. Next time. 5 Link to comment
cteno4 Posted February 2, 2018 Share Posted February 2, 2018 But you know they are there! jeff 4 Link to comment
Pauljag900 Posted February 2, 2018 Share Posted February 2, 2018 2 minutes ago, cteno4 said: But you know they are there! jeff Exactly 👍😀😀 Link to comment
Kiha66 Posted February 2, 2018 Share Posted February 2, 2018 Nice work IST! I bet if you add lights at some point they'll really stand out. Link to comment
kvp Posted February 2, 2018 Share Posted February 2, 2018 (edited) Track and DCC traction power testing on the club layout :-) ps: actually both the track and loading gauges are correct and if this station had overhead, it would be 25kV/50Hz Edited February 2, 2018 by kvp 2 Link to comment
IST Posted February 2, 2018 Share Posted February 2, 2018 2 hours ago, Kiha66 said: Nice work IST! I bet if you add lights at some point they'll really stand out. I keep thinking about adding some lights but at this moment I do not think I will do it in the near future. If I would add lights in the building, I would like to add working street lights also, then I would like to see cars and buses with reflectors (because it would be weird to see street lights but no lights in cars) plus I should install interior lights into my trains, not to mention those additional items like billboards on the buildings. Maybe later, now I am modelling an early afternoon on an extra sunny day somewhere in Japan. 1 1 Link to comment
JR 500系 Posted February 2, 2018 Share Posted February 2, 2018 2 hours ago, kvp said: Track and DCC traction power testing on the club layout :-) ps: actually both the track and loading gauges are correct and if this station had overhead, it would be 25kV/50Hz hahaha i'm sure i havent seen that consist before! Link to comment
Pauljag900 Posted February 2, 2018 Share Posted February 2, 2018 Today I finished raising the levels for the viaduct station,hoping to do the other side over the weekend. the black foam at the front is where the kato road plates will be. 6 Link to comment
tt0880 Posted February 7, 2018 Share Posted February 7, 2018 Today was a huge day for me and my layout... If anyone has looked at my thread on the layout building forum, you've probably seen me struggle with indecision and ask a million silly questions. Well, I decided to throw caution to the winds (and follow some great advice from cteno4) and just take a shot at something. And you know what I did? I actually DRILLED A HOLE for wiring! I went ahead and drilled the hole for the wiring for both tracks of my Unitram set. It looks amazing seeing the trams go around without any ugly wires in the way! This was a huge step for me because it's the first hole I've drilled for a permanent decision since I built the table over half a year ago. I will post pictures, but sadly I am out of a phone at the moment (fun fact: phones and concrete do not mix) but my new one comes tomorrow and I will share my progress with pictures. 7 2 1 Link to comment
cteno4 Posted February 7, 2018 Share Posted February 7, 2018 Great tt! Just takes poking that first hole to realize it’s no biggie if you need to move it later. That’s what wood putty is made for! if you want to be super fancy just glue a chunk of dowel in the old hole, whack off the extra with a little flush cut Saw and sand. Voila! It’s gone! once things are running and you are playing with things I think a lot of those little nagging questions will get answered quickly and a little playing around will answer the harder ones in a fun and productive way. Enjoy! cheers jeff 2 Link to comment
railsquid Posted February 8, 2018 Share Posted February 8, 2018 2 hours ago, tt0880 said: Today was a huge day for me and my layout... If anyone has looked at my thread on the layout building forum, you've probably seen me struggle with indecision and ask a million silly questions. Well, I decided to throw caution to the winds (and follow some great advice from cteno4) and just take a shot at something. And you know what I did? I actually DRILLED A HOLE for wiring! I went ahead and drilled the hole for the wiring for both tracks of my Unitram set. It looks amazing seeing the trams go around without any ugly wires in the way! This was a huge step for me because it's the first hole I've drilled for a permanent decision since I built the table over half a year ago. My baseboards are full of holes I've drilled for "permanent" decisions ;) 3 Link to comment
nah00 Posted February 8, 2018 Share Posted February 8, 2018 1 hour ago, railsquid said: My baseboards are full of holes I've drilled for "permanent" decisions ;) Same here, some have been filled in with putty, other have been unceremoniously covered up with styrene and ground cover. 1 Link to comment
Pauljag900 Posted February 8, 2018 Share Posted February 8, 2018 Think we re all the same ha ha,but as you guys have said,they re easily covered up. my problem is I m always changing my mind and moving stuff😂😂 Link to comment
NXCALE Posted February 8, 2018 Share Posted February 8, 2018 37 minutes ago, Pauljag900 said: Think we re all the same ha ha,but as you guys have said,they re easily covered up. my problem is I m always changing my mind and moving stuff😂😂 Changing your mind is fine, I start to understand that is also part of the hobby... btw, your layout is going at a good pace. Cheers. Link to comment
Pauljag900 Posted February 8, 2018 Share Posted February 8, 2018 Finally I ve completed the track layout and levels.I need one piece of double 248 mm viaduct track,which I m scouring ebay for now,and some single 50mm track piers to replace the polystyrene blocks. Also need some more points for the sidings,I ve got a few but hav nt laid them yet as I’m more concerned with getting the loops completed at the moment.It was a bit of messing about with the levels but I think it s ok clearance wise. the front edges will be tidied up with foamboard and the polystyrene on the layout will eventually become mountains/ hills or on the station,brick walls. next step is to connect the power feeds and track test. fingers crossed👍👍😀 10 Link to comment
Tuga Posted February 8, 2018 Share Posted February 8, 2018 I just love it. Can I play too? 1 1 Link to comment
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now