Jump to content

Search the Community

Showing results for tags 'daishi'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Platform 1 - Birth & Death of a Forum
    • Welcome!
    • Forum Announcements
    • The Agora: General Administrative Discussions
  • Platform 2 - Model Railroading
    • Japanese: N Gauge
    • Japanese: Other Gauges & Scales
    • Trams, LRV's & Buses
    • Worldwide Models
  • Platform 3 - Products & Retailers
    • New Releases & Product Announcements
    • Suppliers
  • Platform 4 - (The Dark Side of) Modelling
    • The Train Doctor
    • DCC, Electrical & Automation
    • The Tool Shed
  • Platform 5 - Layouts, Clubs & Projects
    • Personal Projects
    • Club and Show News
    • T-Trak and Other Small Modular Formats
    • Scenery Techniques & Inspirational Layouts
    • Archived Project Parties
  • Platform 6 - Prototypes
    • Japan Rail: News & General Discussion
    • Japan Rail: Pictures & Videos
    • Worldwide Rail
  • Platform 7 - Other Destinations & Hobbies
    • Travel: Tips, Planning & Memories
    • Other Hobbies: Games, Simulations, Models & Photography
    • Off Topic

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Found 1 result

  1. Tobu Daishi LIne This is a 1.0 km line and is a remnant of the proposed Tobu Nishi-Ita Line which was never completed and was intented to connect the two Tobu main lines, the Tobu Tojo and the Tobu Isesaki. Length 1 km Stations 2 2 car trains http://youtu.be/wjZEw4LXZzY Tobu Ogose Line This is a 10.9 km mostly single track branch line which had through service to Ikebukuro until the 1970s and connects the Tobu Tojo line with JR East Hachiko line. Length 10.9 km Stations 8 4 car trains Keio Inkokashira Line The Keio Inkoashira line runs from Shibuya to Kichijoji on the JR East Chuo Main Line. Like the Tokyu Oimachi line, the Inokashira line is a two track line with express service. The lone four track station is Eifukucho 6.0 km from Shibuya. As an ex-Odakyu line the Inkokashira line is built to the Odakyu gauge of 1067mm rather than the 1372mm gauge used by the other Keio lines. Connections are made with the Tokyu main lines, Saikyo line, Yamanonte line, Shonan-Shinjuku line at Shibuya, Odakyu at Shimo-Kitazawa, the Keio Main Line at Meidaimae and the Chuor LIne Rapid and Chuo-Sobu line at Kichijoji . Shibuya timetable http://www.keio.co.jp/english/shibuya/timetable.html Length 12.7 km Stations 17 5 car trains Next the Seibu stub lines....
×
×
  • Create New...