Jump to content
Yavianice

JR East performing test runs on Joban line through exclusion zone

Recommended Posts

Yavianice


still on track to open in March 2020

  • Like 7

Share this post


Link to post
katoftw

Woah, that voice over lady was a little crazy.  It was like the Japanese version of Alvin the chipmunk.

 

5 car trains, a little optimistic considering most of the population hasn't moved back.  Unless just for testing purposes?

Share this post


Link to post
Welshbloke

I suspect the voiceover is a computer generated voice, I've heard similar on other videos from Japan. Presumably some people are very nervous about using their own voice to narrate!

Share this post


Link to post
Sacto1985

Good news: YouTuber (and JNS Forum member) ayokoi just posted a video of the first revenue run from Tomioka to Haranomachi:

 

 

  • Like 4
  • Thanks 1

Share this post


Link to post
RossDensha

Gami also did a video of the first Hitachi limited express from Ueno to Sendai

 

They used the Oh Ueno Station melody, which I don't think is common practice? Not sure.

  • Like 6

Share this post


Link to post
Sacto1985

Question: I wonder why JR East uses the E531 instead of the E721 train sets between Tomioka and Haranomachi? Wouldn't be just easier to extend the E721 service from Haranomachi instead? 🤔

Share this post


Link to post
Yavianice
Posted (edited)

The E531 runs from Iwaki to Tomioka (and now Haranomachi) at least, that was the case when I visited the region for the first time.

Edited by Yavianice

Share this post


Link to post
RossDensha
Posted (edited)

It's probably because of where they're based. 

The E531s are based at Katsuta and Oku depots (Tokyo) but are designed to operate over the whole Joban line, so they can go back to the depot from far away spots like Haranomachi. The E721 probably isn't designed for that, and obviously can't be based in Tokyo (AC only). They're also based in Sendai and they probably want to keep them reasonably close to their home depot. Service may also not be needed past haranomachi, so they just use E531s because they're meant to be used for long distance.

 

A lot of that is speculation, and not cold hard fact...

Edited by RossDensha

Share this post


Link to post
Cat

It was very interesting to see the different stages of re-construction in progress, and the big concrete embankment wall that had clearly slumped during the earthquake but is still apparently structurally sound enough.

Share this post


Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...